Bathroom Remodels

A waterproofing membrane goes under every tile job here, no exceptions.

If you've priced a bathroom remodel cost Austin TX job elsewhere and the number seemed low, ask whether membrane waterproofing is actually in it. We price per bathroom in three scope tiers, and the membrane is in every tier, not an upgrade line.

Hands spreading tile adhesive on a bathroom wall with a notched trowel
Tile set over membrane, shower wallAustin, TX
Waterproofing method

Why the membrane goes in before a single tile.

Grout and tile alone aren't waterproof. Water moves through both over time, and what stops it from reaching the wall framing or subfloor is a continuous waterproofing membrane behind every tiled wall and under every tiled floor, tied into the drain and up the wall past the highest point water can reach in a shower.

We check the membrane for continuous coverage and a clean tie-in at every seam, curb and drain before the first tile goes up. A pinhole in the membrane behind a tub surround doesn't show up for a year, and by then it's a subfloor problem, not a grout problem. That inspection step doesn't change by fixture tier.

Three fixture tiers, one waterproofing standard.

The tier changes fixtures, tile extent and layout complexity. It never changes whether the membrane goes in.

Bathroom remodel fixture tiers
TierWhat's typically in itTypical lead time
StandardExisting layout kept, fixtures and tile replaced in kind, membrane throughout the wet area7–9 working days
UpgradedLarger format tile, a tiled shower pan replacing a tub, upgraded vanity and fixtures9–12 working days
High-endLayout change, moved drain or supply lines, custom niche and bench framing, full-height tile12–15 working days

Layout changes that relocate a drain or supply line push toward the high-end tier because they add a licensed plumber's scope, not because the tile itself costs more. That plumbing line is named separately on the estimate.

Included in the per-bathroom basis

  • Demo of existing tile, tub or shower surround, and vanity
  • Waterproofing membrane, every tier, tied into drain and curb
  • Tile set, grout and caulk at all wet-area transitions
  • Vanity, toilet and fixture install once membrane and tile cure
  • Paint touch-up on walls and trim disturbed by the work

Not in the base number

  • Fixture, tile and vanity material cost, sourced separately or through us at cost plus a markup stated in the scope
  • Supply line or drain relocation — licensed plumber, named on the estimate
  • Ventilation fan wiring or a new circuit — licensed electrician, named on the estimate
  • Structural floor repair beyond patching, if the subfloor is compromised past code minimums

Before you call

Questions this trade gets most

The membrane question comes up on nearly every call. The rest usually follow it.

Why does every tile job get a waterproofing membrane?

Grout and tile aren't waterproof on their own. A continuous membrane behind the tile and under the floor is what actually keeps water out of the wall and subfloor, and we run it on every job regardless of tier or budget.

How is a bathroom remodel priced without a flat rate?

Per bathroom, in the three scope tiers above, set by fixtures, tile extent and layout changes. Moving a drain or supply line changes the tier because it adds a plumber's scope, not because we're marking the job up.

Do you move plumbing to change a bathroom layout?

We coordinate the framing and finish work around it, but supply line and drain relocation is done by a licensed plumber, named on the estimate rather than folded into our number.

How long does a typical bathroom remodel take?

Seven to fifteen working days depending on tier, once fixtures and tile are on site. A layout change that moves plumbing runs toward the longer end of that range.

Get the fixture tier and the membrane confirmed in writing.

Tell us the current layout and what you want to change. We'll walk it, set the tier, and hand back a written scope before any tile is ordered.